top of page

Profile
Join date: Mar 28, 2024
Posts (14)
Jan 7, 2026 ∙ 1 min
WHY REMOVE THE BEAD?
Eliminate the bead. Eliminate the problem. External HDPE beads are removed primarily for aesthetic reasons, to allow for easier slip-lining into older pipes, to enable better inspection of the weld joint, and sometimes for specific structural/functional needs like in conduit systems , though internal bead removal is more common for flow optimization. The removal process, called debeading, creates a flush surface, improving performance in specific applications without harming the pipe's...
1
0
Sep 14, 2025 ∙ 1 min
What is the Fusion Process?
The pipe fusion process associated with our Hire fusion machines is a widely accepted process that joins two pieces of thermoplastic pipe...
6
0
Sep 14, 2025 ∙ 1 min
See the McElroy Tritan 560 in Action
Hire the McElroy Tritan 560 through ACU-TECH. The Tritan ® 560 aids in pipe positioning, allowing for more flexibility and increased...
3
0
Admin
More actions
bottom of page
